The pipe is ready for concrete near Source Lanon. In the photo below, notice the
marks from jackhammer on the rock walls. This is one of the things that made the spring capping such a challenge. In some places near the source, the men had to jackhammer the trench five feet wide and fourteen feet deep in rock while in other places had to dig in dangerously soft and wet ground.
There are no big concrete mixer trucks in this region of Haiti. Concrete is mixed in small machines and transported into the trench bucket by bucket.